A Link-Belt ATC3275, 275 ton all-terrain crane and El Terrero Constructions Link-Belt crane, are hoisting bridge beams for BNSF and the City of Belen. The railroad bridge beams project was located in Belen, New Mexico.
The bridge required 5 spans with 1 girder per span. The bridge beams weighed ~140,000 lbs.